Main phases of repair works in the apartment.
How to start repair works of the apartment?

One more amongst the most crucial and "dusty" works is the window block replacement. It is essential to do this firstly because dirt and dust will be unallowable during following phases and it is forbidden at all to open windows during painting and wallpaper works (large drops of the temperature and moisture are unallowable). After mounting windows and windowsills it is needed to pack them instantly in polyethylene film and to cover windowsills in addition by the fiber board (in order to prevent scratches).
The following phase is electrical wiring. Electrical wiring can be installed in walls or along the floor. Circuitry is made inside the pipelines to guarantee electrical security and boost dependability. The pipeline secures electrical wiring from external damages and allows to replace the wire completely without breaking walls and floor just by placing the new wire instead of the old one.
House Painting follows the electrical wiring. The regular mistake throughout the synchronised conducting of such works happens when employees forget to lay out one of the cable televisions clear drains article for homeowners and home painters have currently plastered and ravelled the wall. As a result, additional works are needed to seal chases on the ended up wall. The locations of the feed switch and wall outlet place and their number must be thought-out in advance. The scheme of power circuitry is typically included into the style project.
Later on the system must be all set to service in case of failures. In addition to the electrical wirings, the telephone cable television and the television cable television are set out. The power cable television need to not be set out near the telephone and antenna cable televisions to avoid noise pickup and interference. The most peculiar minute is setting out the television cable. In order to make 2 (or 3) TV sets in the apartment or condo the 2nd cable television is often simply "securely soldered" in parallel, so the cable television resistance is decreased. As an outcome, the screen quality is degraded, many programs can't be gotten and etc. In order to avoid such circumstance it is necessary to welcome an expert with special equipment. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-lasting process, that is why it is carried out simultaneously in all facilities, if it is possible. Hold-ups are related to the technology. Each applied layer of the plaster (or filling out ending up) need to dry totally before the work will continue.
Works in hygienic arrangements and the kitchen start concurrently with house painting. It is better to satisfy so-called "dirty" works in the first place and simultaneously. In accordance with the strategy of the hygienic specialist place welding, wall chasing and pipeline run are carried out. Steam radiator admissions are prepared, taps and brackets are installed, however radiators are not installed.
Then works in hygienic plans are conducted according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below phase is assembling ceiling and laying tiles on the flooring. And at last other hygienic gadgets, mixers and devices are mounted.
After wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of electrical wiring are insulated and set out into rosette plates. Sockets and breakers are not set up during this stage in order to conserve their surface look. The surface puttying of walls is carried out simultaneously. The technically exact control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that measures wetness of the material.
The following phase is the procedure of fill. Fill can be made with different products-- from typical masonry cement-sand mix to self-aligning floors. The benefit of the basic mix is its cheapness, the downside is that such mix is much harder aligned at the level and the last dry time of such fill is 40 days, just then the next phase of the work with flooring can be conducted, i.e. the duration is too long. Self-leveling self-aligning floors are much more expensive, however more technological. Lining up takes place almost "instantly" i.e. fluid option of mixture is put out, then it runs and you get the horizontal surface area. The final dry time is 15 days i.e. you have considerable time economy. The system "warm floor" is set up into the fill. If the so-called "damp procedures" are inapplicable the technology of the dry lining up (the fill technology) is used bases for floorings with adjustable flooring battens are mounted.
After fill door boxes and door are set up. Setup of doors need to take into the account density of future floor covering. After setup the door can be removed its hinges and eliminated till completion of repair or loaded into polyethylene movie to protect from damages. Simultaneously ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile should be laid on the definitely dry overlay.
Finishing of the floor installing depends on the prepared covering. In most cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to provide the close repairing of plywood and long-lasting service of the floor without squeak and bulging. The plywood gives the extra heat- and acoustic insulation. After mounting of the plywood is completed, wallpaper for painting can be pasted on walls.
In premises where surface covering of the flooring is laminated floor covering or parquet stockpile, the common wallpapers are pasted (not for painting) in the first place. Then the floor covering is mounted.
If surface covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the common wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The pointed out consequence is connected just with such scrambling procedure when the fantastic amount of dust is developed. In spite of the fact that excellent flooring grinders are equipped with the vacuum cleaner, the enough quantity of dust is precipitated on surrounding subjects consisting of walls. Dust is really acerbic and is severely cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be thought about to be completed. It is left only to set up the plinths, ornamental aspects, breakers and sockets, drape holders, to hang doors, plant-bands and others.
In conclusion it is necessary to note that the sequence of works was noted in basic and can alter depending on the guaranteed scenario-- the number of rooms in property, your resources, peculiarities of the building and construction of the multilevel premises. It is based on sound judgment and every person capable of analysis can separately produce such a series.